No Carts Before Horses - Design for Energy Efficiency Early

My recent visit to Savannah for the USGBC's green product expo charged up my historic preservation bug and got me to thinking about how to apply building science to historic buildings.

Most of us that have ever lived in, owned, or even just visited a historic home know that they are not the most comfortable places to be during the hottest and coldest times of year, even with an adapted heating and air conditioning system. They perform great in mild weather, however. In fact, they might even be more comfortable because of the “natural ventilation” of temperate air. These homes are typically very leaky, have single pane windows and little to no insulation, which all leads to drafty, uncomfortable conditions during extreme weather.

During my trip to voodoo country, I spoke with a homeowner said he was interested in the best way to "create an efficient envelope as it's best to get that done right at the beginning." He had hit the nail on the head, start early! In fact, start as soon as you begin to think about a new home.

Too many projects put the cart before the horse by not incorporating energy efficiency, sustainability or high performance until the project is well under way. Either it is already designed, permitted and ready to be built, the foundation is already in the ground, or the house is completely built and lived in.

In the case of historic homes, the challenge may seem much greater than the homeowner who decides to incorporate energy efficiency when they’re starting to set the foundation. But, you see, a historic home is what it is, where a new home can be changed. And, that is where things can get messy.

While the list of reasons why a project team decides to ‘Go Green or Efficient’ late in the game may be long, I can come up with a very short and maybe more compelling list of (2) reasons why not to, and one way how not to.

Why Not Reason No. 1: Change is expensive!!

OK, maybe not always. But, anyone who has been involved in the construction of a new home or an existing renovation/addition knows that at least 90% of the time a change is made mid-stream, it costs money. Even if it’s just swapping out models of a dishwasher that cost the same or less, the installation of it may be different, or it may be too big for the space in the already installed cabinets. (Changing cabinets can get really expensive!)

Another example: let’s say your home is completely designed and permitted for construction, and you’ve decided you want to make it energy efficient. One of the first things an energy efficiency consultant or green builder will recommend is a better thermal barrier (insulation). This usually includes more than justextra insulation; it also means proper installation of that insulation, and/or making it continuous. Extra insulation can be accomplished in different ways, but many times it means thicker walls. The same with continuous insulation, it can call for thickening the exterior wall assembly with rigid foam board on the outside, or using 2x6 framing instead of 2x4 to accommodate thicker insulation with higher R-value. Lastly, proper installation can mean using “raised heel trusses”, which essentially raises the roofline.

All of these changes will add cost to the construction budget, for sure. They will also add cost to the design fee. For example, raising the roof may require that the building elevations and sections be re-designed in order to meet height restrictions of your neighborhood's design guidelines. Thickening the walls (either to provide extra or continuous insulation) may effect the floor plans because originally the house was built right up to the setbacks, so you can’t add thickness to the outside, and adding it to the inside may reduce the stair width below code minimum, forcing a re-design.

Finally, let's say you also ask the builder incorporate good air sealingtechniques along with better insulation. Now, the HVAC system will likely be oversized. High performance homes require less heating and cooling. In addition, the you've decided to relocatethe ductwork to within conditioned space instead of the unconditioned attic (very hot up there), which requires deep floores truss between the first and second floor to house the duct system. Because the first floor already has a low (8’-0”) ceiling height, you decide to move the 2nd floor level up to accommodate the deeper trusses. This adds an extra tread and riser to the stairs, which makes the bottom landing too small, and now you’re back to the architect to redesign the floor plan, sections, elevations, etc., etc., etc.

Is it becoming clear as mud? I hope so, because my blog software is telling me that I’m rambling on, and to wrap it up! So, I will.

“Why Not” Reason No. 2: Change takes time!!!

Need I say more? Everything I just described doesn’t happen in a vacuum, and requires hours to complete.

“How Not” Solution No. 1: Don’t wait!!!

Start early andintegrate! As I mentioned above, when you think about designing your next home, make all these features as integral to the design as the number of bedroom, the architectural style and the view to ocean. The house works like a system, and requires everything to work harmoniously to perform at its best. Plus, you don't want pay to back track.

 

 

 

 

- from the desk of Energy Vanguard's architect dude

 

Mercer-Williams House photo by kiraca and Cart before horse photo by emilio labrador from flickr.com, used under a Creative Commons license.

Views: 169

Tags: Architecture, Building, Design, Efficient, Energy, Green, HVAC, Science

Comment

You need to be a member of Home Energy Pros to add comments!

Join Home Energy Pros

Home Energy Pros

Home Energy Pros was founded by the developers of Home Energy Saver Pro (sponsored by the U.S. Department of Energy,) and brought to you in partnership with Home Energy magazine.

Latest Activity

peter chang replied to peter chang's discussion Programmable tstat for electric baseboard?
"Yes, in fact I did just that for my kitchen toe-kick heater because the original thermostat was on…"
5 hours ago
Bob Blanchette replied to peter chang's discussion Programmable tstat for electric baseboard?
"Savings depends a LOT on how it's programmed. I've even done a setup with a contactor,…"
11 hours ago
Bob Blanchette replied to Hal Skinner's discussion Any success getting landlords to energy upgrade a single family rental unit?
"Sell utility subsidized services to the tenants. It has to pay back within a year though."
11 hours ago
Tom Mallard replied to Hal Skinner's discussion How much heat energy is lost through the floor of a house?
"Thx, Robert. Being a PNWester where crawl spaces are moist or wet seasonally & some sites never…"
15 hours ago
Hal Skinner added a discussion to the group The RCC Classroom (Radiant Control Coatings)
15 hours ago
Hal Skinner replied to Hal Skinner's discussion How much heat energy is lost through the floor of a house?
"I can only speak for the one I have worked with over t6he years.  We have a certification for…"
15 hours ago
Chad Mcaulife replied to Chad Mcaulife's discussion BPI QCI Cert.
"Thanks for the reponses.  I have a 40 hr class staring 12-8-2014 which should prepare me for…"
15 hours ago
Hal Skinner replied to Hal Skinner's discussion How much heat energy is lost through the floor of a house?
"Hi George, I can see where this could be a HUGE issue in Canada.   We spray our RCC directly…"
17 hours ago

© 2014   Created by Lawrence Berkeley National Laboratory.

Badges  |  Report an Issue  |  Terms of Service