The infrared image below (left) was taken by Jerritt Gluck of Bonded Building & Engineering. The concrete slab (right) had recently been drilled by a steel contractor, after which the following occurred. What is wrong with this picture, and what's the solution? What steps should the contractor and installation crew have taken to avoid this?
© 2013 Created by Lawrence Berkeley National Laboratory.