If you put housewrap on like this what benefit is there?

Views: 240

Attachments:

Reply to This

Replies to This Discussion

Maybe code requires it and the inspector doesn't care if it actually works or not?

Not clear what the problem is - is it upside down so you can't read it and therefore not giving the full advertising capability?  Or is it  not tucked under the fake siding above and we don't yet know what the flashing will be there?  Are there not enough fasteners with washers underneath?  Is the overlap of the two pieces too small?  Perhaps we don't know how many weep holes are in the J-channel across the bottom to let any accumulated water out?  Maybe it's that white pole interfering with the installation?

If this is step one on a vinyl siding job there may be clapboards or other siding on the first story wall that has or is suspected to have lead or asbestos. The wrap could be intended to encapsulate the potentially hazardous material. If that were the case, the building wrap should be installed shingle style where it ends at the second floor cladding (as per Ed M's remarks above).


WRT the upside down installation:  we often see this detail in projects done south of the equator.

RSS

Videos

  • Add Videos
  • View All

Twitter

Latest Activity

Eve Dunham replied to Kim Tanner's discussion Facebook page targeting and privacy in the group Marketing Energy Efficiency
"I have used the targeted ads feature for age, location, etc. I have had moderate success with this.…"
20 hours ago
Home Energy Magazine's blog post was featured
yesterday
Hannah Finch posted a blog post
yesterday
Profile Iconpank and Carrie Sturrock joined Home Energy Pros
yesterday
tedkidd commented on Amber Vignieri's blog post Chicago Winter No Match for Retrofitted Logan Square Building
"This case study is an example of how hard it is simply to do a compelling case study. Everyone has…"
yesterday
B. M. Lubin posted an event
Thumbnail

GPRO Construction Management Class at USGBC-LI headquarters in Hauppauge, NY at USGBC-LI Headquarters

September 19, 2016 at 9am to September 20, 2016 at 2pm
Taught by industry experts using real-life classroom exercises, GPRO CM gives experienced building…See More
yesterday
B. M. Lubin is now a member of Home Energy Pros
Monday
Eric Kjelshus replied to tedkidd's discussion Dear DOE, PACE sucks - please fix or make it go away...
"Most HVAC system upgrade - change outs and attic seals-R-49 end up $20-30K   Most house -…"
Monday

© 2016   Created by Lawrence Berkeley National Laboratory.   Powered by

Badges  |  Report an Issue  |  Terms of Service