Was just looking for some input on different techniques for ensuring a permanent seal between a block foundation wall, and a 6 mil. poly barrier resting on a dirt crawlspace floor?  If one could referrence specific products that would aide also.  Thanks in advance for your input.

Views: 2108

Reply to This

Replies to This Discussion

I use CCA treated furring strips and mastic in the caulking tubes. Wrap the plastic around the strips, apply mastic, and fasten to the block with a hilti gun. Time consuming but it seems to work.

Tim,

I have used a recommend a product from crawlspacerepair.com called "Foundation Seal Tape".

It is a very strong and tacky double sided tape that is also waterproof.  I apply it continuously around the crawlspace about 3" below the top.  I use 15 mil poly that goes down the wall and then across the floor.

The tape seals and temporally mechanically holds the barrier in place until I ADD mechanical fasteners every 2 feet for  permanent bond.  

I highly recommend this product.

Tripp

I use the same mastic I use for sealing ducts, in my case Air Seal polymer adhesive.  Brush on a thick layer, then attach to the foundation wall as James describes.  I also use it for the laps across the crawlspace floor.  I don't trust the tape that Tim mentions.

I'm of the opinion that mechanically fastening the furring strips is a necessary, time consuming, and therefor costly step merely to insure the vapor barrier stays in place till the mastic dries. Once it dries, your not pulling the VB off without some effort.  If I come up with an easier alternative to temporarily hold the material in place, I'll test that theory and get back to you.

Tim,

I imagine you're using foam on the walls in the crawl space? If so, I have recently switched to foaming over the vapor barrier. It has been a very effective approach, assuming someone doesn't crawl through the space like a bat out of Hell and rip the barrier off the wall.

I run the poly up the walls (about 6 inches) and spray over the poly, and spray especially thick at the interface of the walls and the floor of the crawl.

Just my take on this, given personal experience and a genuine concern for the cost of projects getting out of control for the average HOs.

Don't use poly, use EPDM roofing material. Then you can use sprayfoam to seal.

Pat, about what are you paying per square foot of the EPDM membrane? I assume you use a roughly 60-mil product?

Thanks in advance!

Patrick

The EPDM can be purchased at 40 mils and 60 mils. I use the 40, over the past couple years we have paid between $0.80 and $1/sf for it. We buy black material. The white is much higher cost. It is very unlikely that it will see any sunlight or wear, so i see no reason to go thicker.
We usually spray foam fom the subfloor down on th EPDM and at east 4 ft in long the bottom of the wall and seal all joints. I am in upstate NY, 7000 HDD, so frost penetration under the wall governs how much of the floor we spray. I usually spray the whole floor if the space is less than 16 ft across. That is an arbitrary choice.

I do know of one job where the owners decided to tear down the existing house and put a year round residence in place of it after we did this work. he is a friend of mine, and he called to tell me demolishing the house was easy with an excavator until they got to the crawl space. Apparently the EPDM stretched enough so the excavator could not pull far enough to pull it loose from the block. In the end it pulled the blocks out still attached to the EPDM.

Impressive story Pat.

Thanks for the info on the EPDM!

I think you may have made a convert out of me (from poly vapor barriers to EPMD).

The foam manufacturer's make an extra sticky single part foam - same chemicals as the air sealing foam, different proportions.  We use Convenience Products Foam and they make one called Panel Foam.  This sticks the plastic up quite well, then we use it stick 2" board on the wall overlapping the plastic by a foot or so

i haven't heard of this before.  as far as I know all urethanes are 1:1 ratio, so i would sooner believe the resin/iso mix is 1:1, but the chemical reaction time is slowed a lot. 

have you gone back to one of these a month or further after install to see how the adhesion is? 

generally we get worse results with single component and dual component 'portable' or 'unheated' kits than we do with plural component heated kits.  those electric wraps for the cylinders are well worth the cost and hassle. 

Pat

I have no doubt that the ratio is 1:1, but not all are the identical formula.  We have been doing this for about 10 years and have had occasion to get back in to see up to 3-4 years later - no problem.  The 2 inch board is not extruded styrene but iso board with faces on it.

Any problems w/ VOC in crawl space during application or migration to home through floor?

RSS

Home Energy Pros

Home Energy Pros was founded by the developers of Home Energy Saver Pro (sponsored by the U.S. Department of Energy, under the American Recovery and Reinvestment Act) and brought to you in partnership with Home Energy magazine.

Latest Activity

Meagan Foster posted events
45 minutes ago
Meagan Foster updated an event

EnergyLogic's RaterFest! at Black Hawk, CO

September 13, 2013 at 10am to September 15, 2013 at 12pm
Join us for one of the best home energy conferences available!  This retreat will provide…See More
48 minutes ago
Meagan Foster updated an event

Homes 401: Green Rater Training at Berthoud, CO

June 25, 2013 to June 26, 2013
This highly interactive workshop builds upon the material presented in the online course, further…See More
52 minutes ago
Meagan Foster updated an event

HERS Rater Training - Online at Online

July 1, 2013 to July 26, 2013
NEW - our great RESNET HERS Rater online training is now completely self-paced, so you can start at…See More
53 minutes ago
Meagan Foster updated an event

BPI Building Analyst Training - Online at Online

June 3, 2013 to June 28, 2013
Join the EnergyLogic Academy for our BPI BA online training - we just went to a completely open…See More
56 minutes ago
Anna Svensson posted a discussion

Looking for residential building and remodeling experts

Making sure you residential building and remodeling professionals out there are aware of the call…See More
2 hours ago
Bryce Cramer joined Leslie McDowell, BPI's group
Thumbnail

Building Performance Institute (BPI)

BPI is the nation's premier standards development, quality assurance and credentialing organization…See More
5 hours ago
Bryce Cramer replied to Mike Kandel's discussion June's Stump the Chump: What's Wrong with this Picture? in the group Building Performance Institute (BPI)
"Key is this was done in warm weather. The back wall of the room was also uninsulated, but the lower…"
5 hours ago
James Hatheway added a discussion to the group Job Board
Thumbnail

Quality Assurance Verification Specialist - Little Rock, Arkansas

CLEAResult (clearesult.com) is looking for a QA Verification professional who wants to leverage…See More
7 hours ago
Profile IconJames Hatheway and Mike Wallis joined Diane Chojnowski's group
Thumbnail

Job Board

This group is for posting jobs related to all aspects of the home performance industry including…See More
7 hours ago
Profile IconJames Hatheway, Malcolm Gray, Perry Ning and 2 more joined Home Energy Pros
7 hours ago
tedkidd commented on Mike Rogers's blog post HOMES Act introduced with Bi-Partisan Sponsorship
"% savings programs suck.  Ask the folks in CA.  When your incentive structure pits…"
8 hours ago

© 2013   Created by Lawrence Berkeley National Laboratory.

Badges  |  Report an Issue  |  Terms of Service