Was just looking for some input on different techniques for ensuring a permanent seal between a block foundation wall, and a 6 mil. poly barrier resting on a dirt crawlspace floor?  If one could referrence specific products that would aide also.  Thanks in advance for your input.

Views: 5978

Reply to This

Replies to This Discussion

I use CCA treated furring strips and mastic in the caulking tubes. Wrap the plastic around the strips, apply mastic, and fasten to the block with a hilti gun. Time consuming but it seems to work.

Tim,

I have used a recommend a product from crawlspacerepair.com called "Foundation Seal Tape".

It is a very strong and tacky double sided tape that is also waterproof.  I apply it continuously around the crawlspace about 3" below the top.  I use 15 mil poly that goes down the wall and then across the floor.

The tape seals and temporally mechanically holds the barrier in place until I ADD mechanical fasteners every 2 feet for  permanent bond.  

I highly recommend this product.

Tripp

I use the same mastic I use for sealing ducts, in my case Air Seal polymer adhesive.  Brush on a thick layer, then attach to the foundation wall as James describes.  I also use it for the laps across the crawlspace floor.  I don't trust the tape that Tim mentions.

I'm of the opinion that mechanically fastening the furring strips is a necessary, time consuming, and therefor costly step merely to insure the vapor barrier stays in place till the mastic dries. Once it dries, your not pulling the VB off without some effort.  If I come up with an easier alternative to temporarily hold the material in place, I'll test that theory and get back to you.

Tim,

I imagine you're using foam on the walls in the crawl space? If so, I have recently switched to foaming over the vapor barrier. It has been a very effective approach, assuming someone doesn't crawl through the space like a bat out of Hell and rip the barrier off the wall.

I run the poly up the walls (about 6 inches) and spray over the poly, and spray especially thick at the interface of the walls and the floor of the crawl.

Just my take on this, given personal experience and a genuine concern for the cost of projects getting out of control for the average HOs.

Don't use poly, use EPDM roofing material. Then you can use sprayfoam to seal.

Pat, about what are you paying per square foot of the EPDM membrane? I assume you use a roughly 60-mil product?

Thanks in advance!

Patrick

The EPDM can be purchased at 40 mils and 60 mils. I use the 40, over the past couple years we have paid between $0.80 and $1/sf for it. We buy black material. The white is much higher cost. It is very unlikely that it will see any sunlight or wear, so i see no reason to go thicker.
We usually spray foam fom the subfloor down on th EPDM and at east 4 ft in long the bottom of the wall and seal all joints. I am in upstate NY, 7000 HDD, so frost penetration under the wall governs how much of the floor we spray. I usually spray the whole floor if the space is less than 16 ft across. That is an arbitrary choice.

I do know of one job where the owners decided to tear down the existing house and put a year round residence in place of it after we did this work. he is a friend of mine, and he called to tell me demolishing the house was easy with an excavator until they got to the crawl space. Apparently the EPDM stretched enough so the excavator could not pull far enough to pull it loose from the block. In the end it pulled the blocks out still attached to the EPDM.

Impressive story Pat.

Thanks for the info on the EPDM!

I think you may have made a convert out of me (from poly vapor barriers to EPMD).

The foam manufacturer's make an extra sticky single part foam - same chemicals as the air sealing foam, different proportions.  We use Convenience Products Foam and they make one called Panel Foam.  This sticks the plastic up quite well, then we use it stick 2" board on the wall overlapping the plastic by a foot or so

i haven't heard of this before.  as far as I know all urethanes are 1:1 ratio, so i would sooner believe the resin/iso mix is 1:1, but the chemical reaction time is slowed a lot. 

have you gone back to one of these a month or further after install to see how the adhesion is? 

generally we get worse results with single component and dual component 'portable' or 'unheated' kits than we do with plural component heated kits.  those electric wraps for the cylinders are well worth the cost and hassle. 

Pat

I have no doubt that the ratio is 1:1, but not all are the identical formula.  We have been doing this for about 10 years and have had occasion to get back in to see up to 3-4 years later - no problem.  The 2 inch board is not extruded styrene but iso board with faces on it.

Any problems w/ VOC in crawl space during application or migration to home through floor?

RSS

Home Energy Pros

Home Energy Pros was founded by the developers of Home Energy Saver Pro (sponsored by the U.S. Department of Energy,) and brought to you in partnership with Home Energy magazine.

Latest Activity

Richard Beyer replied to Howard Katzman's discussion UV lights on filters
"Howard, There are numerous manufacturer's who swear these systems work and then you have the…"
7 hours ago
Christopher Morin posted a blog post

How do You Test a TXV?

  Thermostatic Expansion Valves (TEV or TXV), one of the most popular metering devices for…See More
10 hours ago
Howard Katzman posted a discussion

UV lights on filters

 recently saw UV bulb installations in 2 HVAC systems in a home. Each system had the Lennox Healthy…See More
12 hours ago
Don Fitchett joined Michael Stuart's group
Thumbnail

INFRARED THERMOGRAPHY USERS

This group is dedicated to knowledge sharing and discussion of infrared thermography for building…See More
12 hours ago
Don Fitchett commented on Diane Chojnowski's group Pinterest
"While most of our (BIN95.com) energy post and boards are industrial related, there are crossovers…"
13 hours ago
Don Fitchett joined Diane Chojnowski's group
Thumbnail

Pinterest

Do you have a Pinterest board for energy topics?Post the link to your Pinterest energy board in the…See More
13 hours ago
Profile IconJosh Guenther, Deborah Green, Kenneth Brooks and 3 more joined Home Energy Pros
14 hours ago
Jim Gunshinan commented on Jim Gunshinan's blog post My Energy Upgrade California—The Numbers Are In
"Hi David, to answer one question, the crawlspace was covered with thick poly and the seams were…"
14 hours ago
David Eakin commented on Jim Gunshinan's blog post My Energy Upgrade California—The Numbers Are In
"Jim, Maybe a little more detail on the project is in order. You say that your crawlspace is now…"
14 hours ago
Jim Gunshinan commented on Jim Gunshinan's blog post My Energy Upgrade California—The Numbers Are In
"Ed, no problem, I caught your meaning. Ted, I made a judgement that a mini split would be the best…"
14 hours ago
tedkidd commented on Jim Gunshinan's blog post My Energy Upgrade California—The Numbers Are In
"That makes sense.   What are your criteria/metrics for determining what might be the…"
14 hours ago
Ed Voytovich commented on Jim Gunshinan's blog post My Energy Upgrade California—The Numbers Are In
"Yikes!  Not only did I misspell "roof" as "rood," I also meant to more…"
14 hours ago

© 2014   Created by Lawrence Berkeley National Laboratory.

Badges  |  Report an Issue  |  Terms of Service