Question from energy homeowner:

 

Contractor has recommended installing a two stage Water Furnace Envision w/desup NDV049A system into a 2700 square foot cape cod, 1000 square feet basement, 1000 square feet first floor, and a 700 square foot second floor.  The house is all brick and was built in 1950, walls and attics are currently insulated using r 11.  The blower door test gave a  2800 cfm reading at 50.

 

Contractor is recommending a 4 ton geothermal system, According to his comments it is a two stage system that  will run at 60% capacity at the first stage and 100% at the second stage.  Contractor feels the 4 ton system will provide more heat using the geothermal without going to the back up heat.,

 

If the system is over-sized to accommodate the heating season, does this make sense.?  He says with a two stage system it does.  Will the system operate efficiently.  If we were installing a regular electric heat pump the manual J test called for a 3 ton system  (single stage)   Is the contractor correct in over-sizing the unit to provide more geothermal heat in the winter months?

 

One other question: What is the advantage of using galvanized ducts as compared to 1 inch rigid fiberboard ducts?

 

Thank you for responses

 

 

 

Views: 222

Reply to This

Replies to This Discussion

Hi my name is Steve.

If the manual J suggested a 3 ton I would look at a 3 ton two-stage. The two stage units are usually a 1/2 ton larger in size. When I size my units, I try to shoot for a balance point of 5 to 10 degrees outside temperatures here in Michigan. The operating cost seems to be the best at these temps (even with the little back up thats needed). The reason is the larger compressors use most electricity. Now, it's not a lot of difference in operating cost. Having the next size larger is not devastating but you need to have larger duct system and extra loop installed driving up installation cost.

My question is? Did the contractor you are referring to complete a manual J load and does he know where his balance points are. If he can not show you he calculations he is guessing and not doing you a good job.

Note: The home generates a certain amount of heat and you can design at 77% of the calculated load. So if the manual J says you can install a 3 ton then it does not matter if it it two stage or not. Sorry I have to go now my wife i waiting, You can contact me if you have more questions at performancegeothermal@gmail.com.

Steve Shannon

PS, I like sheet metal for duct work.

If the contractor doesn't calculate a manual J,D, and S worksheet for the house then he's merely guessing. Also, galvanized ducting last much longer, is easier to clean, and is more rigid that fiberboard.

RSS

Home Energy Pros

Home Energy Pros was founded by the developers of Home Energy Saver Pro (sponsored by the U.S. Department of Energy, under the American Recovery and Reinvestment Act) and brought to you in partnership with Home Energy magazine.

Latest Activity

tedkidd commented on Tom Delconte's blog post Robert Shiller Says Retrofits Are Never Worth It!
"Bob B.   Buying a home is a good investment because it is forced savings more than a good…"
2 minutes ago
Joe Huang posted a discussion

White Box Technologies launches Web-based weather data for building energy simulations

White Box Technologies is pleased to announce under agreement with ASHRAE the launch of WBT Weather…See More
53 minutes ago
Tom Delconte commented on Tom Delconte's blog post Lykans $29, Vampires $0 !
"Bill: these are available for free at www.freeenergy.com . Just ask for Jen Guarater! I…"
1 hour ago
Joseph Lamy commented on Jim Gunshinan's blog post The Universe Is Made of Stories
"My life changed when I got 'ductalatored' - became familiar with proper sizing guides for…"
1 hour ago
J.C. Martel replied to J.C. Martel's discussion Disasters & sustainable energy
"Thanks Dennis."
2 hours ago
Judi Lyall joined allen p tanner's group
Thumbnail

Energy Auditing Equipment for Sale, Trade or to Purchase

Discuss the pros and cons of the equipment you are interested in prior to purchase. Post equipment…See More
15 hours ago
Judi Lyall replied to David Starrett's discussion I am looking for a good IR camera in the group Energy Auditing Equipment for Sale, Trade or to Purchase
"Hi there I am selling my equipment and have a great Fluke TIR for sale for 3600.00    If…"
15 hours ago
William H Nickerson commented on Tom Delconte's blog post Lykans $29, Vampires $0 !
"66 watts a/sec  -3960 w/min   237600 w/hr   5702400  w/day …"
18 hours ago
tedkidd commented on Jim Gunshinan's blog post The Universe Is Made of Stories
"I think Tom is busting your chops Jim.  The "drivel" part may not have been well…"
21 hours ago
Tom Maides commented on Jim Gunshinan's blog post The Universe Is Made of Stories
"Some of the best scientists of the previous 1000 years were also leaders in the Church.  Aside…"
yesterday
Laurie DiDonato posted an event

HERS Rater Training in Massachusetts at Maki Building Center

June 3, 2013 to June 8, 2013
6-Day HERS Rater Training- The first step to becoming a HERS RaterLast Week To Register!Your Cost…See More
yesterday
Tom Delconte posted a blog post

Lykans $29, Vampires $0 !

Just wondered, does anyone know of a better looking intelligent managed power strip?…See More
yesterday

© 2013   Created by Lawrence Berkeley National Laboratory.

Badges  |  Report an Issue  |  Terms of Service