Nailbase insulation vs. 2 layers of tuff-r with staggered seams

We are going to be rehabbing a home in CT in which the third floor is part of the living space. We want to get the insulation level up by using either nailbase or 2 layers of 2" tuff-r with staggered seams on top of the deck. We are going to use close cell spray foam with polyisocyanurate insulation to increase insulation and stop bridging on the inside. Has anyone used nailbase over spaced wood slats that use to have a cedar shake roof over it? We believe that the closed cell spray foam underneath would act as a vapor barrier, the slats would provide more that enough support and the hot roof is o.k.  but real-world experience would be much appreciated.

Tags: hot, insulation, nailbase, roof

Views: 241

Attachments:

Reply to This

Replies to This Discussion

I would consider using cellulose insulation blown in between the rafters, rather than spray foam against the skip sheathing. Foam on both sides is risky, in my opinion, and will make any future repairs to the roof structure a real challenge. Since you are addressing thermal bridging above the sheathing I don't see the real advantage to more foam below. Proper air-sealing of the drywall lid will probably be adequate, and I'm assuming you are making plans to correctly control interior moisture load anyway.

 

An alternative would be to install all of the insulation below the roof deck. Install baffles made of rigid foam board between the rafters, with a 1"+ vent space, then install cellulose or possibly foam between the rafters, and follow up with foam board across the bottom. That way you preserve the vented roof. Obviously this approach uses up some of your headroom.

Building assesmblies need to be able to dry in at least 1 direction.  Rigid insualtion on top will limit the drying to the outside so you should allow it to dry inward. I would agree with David and use cellulose. I would not use poly on the inside. Vapor diffuison through the drywall is not a big worry. What is a worry is air leaks carrying moisture in to the ceiling. You should consider and air tight drywall system along with a vapor retarding paint. You will also want to use more than 1 layer of rigid insulation with staggered and taped seams.

 

Do not use batt insualtion. Only use a dense pack material as that performs better than batts and cuts down on air movement close to the point of being an air barrier.  I said close but it is not an air barrier.

RSS

Home Energy Pros

Home Energy Pros was founded by the developers of Home Energy Saver Pro (sponsored by the U.S. Department of Energy, under the American Recovery and Reinvestment Act) and brought to you in partnership with Home Energy magazine.

Latest Activity

David Eakin commented on Elisa Wood's blog post Momentum builds for energy efficiency...but is the wolf at the door?
"Here's a very recent article on Green Building Advisor that reinforces the issues to…"
3 hours ago
Home Energy Magazine posted blog posts
5 hours ago
Egr renovation posted a status
"of course he is in paris but works around europe http://ning.it/16KrbS7"
8 hours ago
Egr renovation posted a status
"i just find a good photogrpahe for your master piece http://www.armanimage.com"
8 hours ago

Tom Mallard just added their location.
(via Member Map)

23 hours ago
Profile IconDon Hughes, Julian Sark, James Hatheway and 4 more joined Home Energy Pros
yesterday
Meagan Foster posted events
yesterday
Meagan Foster updated an event

EnergyLogic's RaterFest! at Black Hawk, CO

September 13, 2013 at 10am to September 15, 2013 at 12pm
Join us for one of the best home energy conferences available!  This retreat will provide…See More
yesterday
Meagan Foster updated an event

Homes 401: Green Rater Training at Berthoud, CO

June 25, 2013 to June 26, 2013
This highly interactive workshop builds upon the material presented in the online course, further…See More
yesterday
Meagan Foster updated an event

HERS Rater Training - Online at Online

July 1, 2013 to July 26, 2013
NEW - our great RESNET HERS Rater online training is now completely self-paced, so you can start at…See More
yesterday
Meagan Foster updated an event

BPI Building Analyst Training - Online at Online

June 3, 2013 to June 28, 2013
Join the EnergyLogic Academy for our BPI BA online training - we just went to a completely open…See More
yesterday

© 2013   Created by Lawrence Berkeley National Laboratory.

Badges  |  Report an Issue  |  Terms of Service