Hi There Folks,


I came across this crawlspace vapor barrier installed by a BPI contractor. 

Location:  Bay Area of California- near the ocean.  

Environmental Factors:  The area receives a lot of rain, and is notorious for rising groundwater.  

Health Factors:  The customers have respiratory issues, and these were communicated to the contractor.

Material:  6mm visqueen, red tape, nails

Concerns:  The material stops several inches short of the foundation walls. Some seams are taped with red tape.  Held to ground with 8 inch nails. 

I have a lot of respect for this particular contractor, but I have grave questions about how he approaches barrier installation in crawl spaces.

He has responded that this approach is adequate for unconditioned crawlspaces.  


I would appreciate insights, and direction to standards. 

Tags: barrier, crawl, space, vapor

Views: 12292

Attachments:

Replies to This Discussion

I am not sure what the codes say in Cali but (unless I am overlooking it) there is no requirement in the 2009 IRC or IECC for "vented" crawls

For sealed crawls it is;

R408.3.1 Exposed earth is covered with a continuous Class I vapor retarder. Joints of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the vapor retarder shall extend at least 6 inches (152 mm) up the stem wall and shall be attached and sealed to the stem wall;

As for the groundwater issue:

R408.6 Finished grade. The finished grade of under-floor surface may be located at the bottom of the footings; however, where there is evidence that the groundwater table can rise to within 6 inches (152 mm) of the finished floor at the building perimeter or where there is evidence that the surface water does not readily drain from the building site, the grade in the under-floor space shall be as high as the outside finished grade, unless an approved drainage system is provided.

As for best practices, especially when a respiratory issue is involved - it is basically what everyone else mentioned - run up the foundation wall a minimum of 6", joints lapped lapped, and every hole, seam, etc... should be taped & sealed per manufacturers directions

RSS

Videos

  • Add Videos
  • View All

Twitter

Latest Activity

Profile IconAlfonso Scott, Susan Benford, HomeWiz and 2 more joined Home Energy Pros
3 hours ago
Hannah Wood added a discussion to the group Building Performance Institute (BPI)
Thumbnail

Healthy Home Evaluator (HHE) certification + recorded webinar

Thanks to those of you who joined BPI's webinar on the Healthy Home Evaluator certification…See More
3 hours ago
Michelle Usher posted a blog post

Addison Homes Wins Pinnacle Award for Best Achievement in Energy Efficiency

Addison Homes was amongst the home building industry’s best and brightest honored with a 2016…See More
3 hours ago
Eric Kjelshus replied to Beverly Lerch's discussion Fireplace drafts
"A brick chimney will take some 70,000 BTU's to heat up to draft on a fireplace.   A…"
15 hours ago
Ed Voytovich replied to Beverly Lerch's discussion Fireplace drafts
"Our solution was to install a Lopi Answer wood burning insert that vents directly through a metal…"
22 hours ago
Jim Gunshinan's blog post was featured

A Healthy Home and a Healthy Bottom Line

There has been a lot of interest of late in the weatherization and broader home performance…See More
yesterday
Jonathan Beers commented on Home Energy Magazine's blog post Natural Gas is Becoming Less Attractive
"The carbon intensity of electricity use (lbs. of CO2/MWh) varies a lot from region to region. For…"
yesterday
Diane Chojnowski posted events
yesterday

© 2016   Created by Lawrence Berkeley National Laboratory.   Powered by

Badges  |  Report an Issue  |  Terms of Service