Good morning pros!

I am bidding on a basement renovation of a two story brick home in Arlington, VA. The first story is partially below grade. The foundation walls are CMU construction.

Here are some pictures of the foundation walls with the wood paneling removed:

As you can see, there are existing moisture issues that have to be addressed. There is improper grading at the perimeter of the house (not awful but improper nonetheless), the gutters are under-sized and may have leaks at some of the seams, and there is no interior or exterior drainage system.

The game plan for finishing out the basement is to install 1" XPS against the foundation walls, frame the walls with 2X4s, fill the stud cavities with 3.5" un-faced batt insulation, and finish the walls with moisture-resistant gyp board (National Gypsum Gold Bond XP).

New electrical outlets will be installed, a bunch of recessed lighting installed, new flooring, etc.

I am thinking of addressing the drainage issue with an exterior drainage tile system, and covering the below-grade portions of the foundation walls with Grace's Bituthene system.

Any overall suggestions or points that I should consider?

Thanks,

Patrick

Views: 923

Attachments:

Reply to This

Replies to This Discussion

Sounds like you have it under control. May I recommend adding drainage inside the basements perimeter to make up for the hydrostatic issues hidden beneath the floor and direct them to a sump. Also adding waterproofing sheet membranes on the walls interior prior to insulating. Don't forget the radon fan and ERV while your into it this deep.

Here's a couple helpful links;   http://crawlspacerepair.com/types-of-crawl-spaces/encapsulated-craw...

and     http://crawlspacerepair.com/crawl-space-encapsulation-products/

A dry ventilated basement before covering it up with finished building products should make for a healthy basement when your finished.

Best of luck!

RSS

Videos

  • Add Videos
  • View All

Twitter

Latest Activity

Profile IconShane Matteson, Jay Cooper and Mike Harris joined Home Energy Pros
15 hours ago
Kim Burnett commented on Diane Chojnowski's group Home Energy Pros on Twitter
"Good morning, would you please add me. Thank you. Kim Burnett A+ Abundant Energy Experts"
17 hours ago
Kim Burnett joined Diane Chojnowski's group
Thumbnail

Home Energy Pros on Twitter

We've created a twitter list of members of Home Energy Pros who tweet about home performance and…See More
17 hours ago
Luke Langhals replied to Luis Hernandez's discussion ERV Configuration
"Very good reading. Thank you for posting this."
19 hours ago
Luke Langhals replied to Diane Chojnowski's discussion Poll: How confident do you feel about the future of home performance?
"This poll would change on a day to day basis :) I'm cynical one day and extremely optimistic…"
19 hours ago
Luke Langhals liked tedkidd's discussion Dear DOE, PACE sucks - please fix or make it go away...
19 hours ago
Nicole Scheunemann's video was featured

Airtight, Tested Right: Blower Door Tests for Contractors

Contractors: with a new New York State Energy Code going into effect in October 2016, it’s important to know what you’ll be on the hook for when it comes to ...
20 hours ago
Eve Dunham replied to Kim Tanner's discussion Facebook page targeting and privacy in the group Marketing Energy Efficiency
"I have used the targeted ads feature for age, location, etc. I have had moderate success with this.…"
yesterday

© 2016   Created by Lawrence Berkeley National Laboratory.   Powered by

Badges  |  Report an Issue  |  Terms of Service