Good morning pros!

I am bidding on a basement renovation of a two story brick home in Arlington, VA. The first story is partially below grade. The foundation walls are CMU construction.

Here are some pictures of the foundation walls with the wood paneling removed:

As you can see, there are existing moisture issues that have to be addressed. There is improper grading at the perimeter of the house (not awful but improper nonetheless), the gutters are under-sized and may have leaks at some of the seams, and there is no interior or exterior drainage system.

The game plan for finishing out the basement is to install 1" XPS against the foundation walls, frame the walls with 2X4s, fill the stud cavities with 3.5" un-faced batt insulation, and finish the walls with moisture-resistant gyp board (National Gypsum Gold Bond XP).

New electrical outlets will be installed, a bunch of recessed lighting installed, new flooring, etc.

I am thinking of addressing the drainage issue with an exterior drainage tile system, and covering the below-grade portions of the foundation walls with Grace's Bituthene system.

Any overall suggestions or points that I should consider?

Thanks,

Patrick

Views: 950

Attachments:

Reply to This

Replies to This Discussion

Sounds like you have it under control. May I recommend adding drainage inside the basements perimeter to make up for the hydrostatic issues hidden beneath the floor and direct them to a sump. Also adding waterproofing sheet membranes on the walls interior prior to insulating. Don't forget the radon fan and ERV while your into it this deep.

Here's a couple helpful links;   http://crawlspacerepair.com/types-of-crawl-spaces/encapsulated-craw...

and     http://crawlspacerepair.com/crawl-space-encapsulation-products/

A dry ventilated basement before covering it up with finished building products should make for a healthy basement when your finished.

Best of luck!

RSS

Videos

  • Add Videos
  • View All

Twitter

Latest Activity

George Matthews replied to George Matthews's discussion Shortridge 8400 Flowhood for A/C airflow testing in the group Energy Auditing Equipment for Sale, Trade or to Purchase
"Here are the pics of the flowhood and airdata manometer"
yesterday
Sarah Holloway posted a photo
yesterday
Joe Urycki added a discussion to the group Energy Auditing Equipment for Sale, Trade or to Purchase
Thumbnail

TEC blower door and UEI combustion analyzer for sale

For sale is one used TEC Minneapolis blower door system: Includes model 3 fan with rings A and B,…See More
yesterday
John Nicholas replied to Kevin Emerson's discussion Studies re: radon mitigation and energy efficiency
"The Nay side is well represented with the links already posted. I presented a neutral side, with…"
yesterday
Ray Lehman replied to Kevin Emerson's discussion Studies re: radon mitigation and energy efficiency
"Hey John, Thanks for the information.  Very good empirical data. While I agree that running…"
Friday
John Nicholas replied to Kevin Emerson's discussion Studies re: radon mitigation and energy efficiency
"I have no links, just some anecdotal evidence. I had several Blower Door Tests done on my own home.…"
Friday
Chris Laumer-Giddens commented on Chris Laumer-Giddens's blog post Raising the BARrier in North Carolina Mountain Home, Air Tight Ceiling
"@Joe Nagan, We have found this technique to be WAY simpler and A LOT less labor than making a…"
Thursday
Judy Rachel replied to Blake Shurtz's discussion Testing spillage on induced draft furnace?
"I hope the attached picture is clear enough for you to see.  As the caption on the picture…"
Thursday

© 2016   Created by Lawrence Berkeley National Laboratory.   Powered by

Badges  |  Report an Issue  |  Terms of Service